Seal openings of all new sanitary waste and vent piping.

  • Final Inspection – After all plumbing fixtures are set and connected.
  • Fill piping with approximately 5 pounds of air pressure 5 P.S.I) or fill plumbing with a 10′ head of water.
  • 2nd Rough Inspection – prior to covering pipes with dry wall or insulation.
  • If there are no leaks, call for an inspection. Fill piping with approximately 5 pounds of air pressure (5 P.S.I) or fill plumbing with a 10′ head of water.
  • 1st Rough Inspection – prior to covering any underground plumbing.
  • piping isometric drawing for bathroom

    Inspection requirements on sanitary waste and vent Test should be applied to system at least 15 minutes prior to scheduled inspection.Inspection testing equipment must be supplied by permit holder.Plumbing must be inspected before being covered.All hose bibbs must be protected with vacuum breakers.Ĭopies of code available through Plumbing, Heating, Cooling Contractor’s Association at (440) 543-4011, or Cincinnati Master Plumber’s Association, (513) 742-2672.Shower and tub valves must be A.S.S.E.Shower heads and tub spouts must be secure.Pipes extending through walls must be supported by compatible materials.All engineering, workmanship, pipes, fittings, and fixtures must comply with Ohio Basic Plumbing Code.Submit an isometric drawing of all waste and vent lines.

    piping isometric drawing for bathroom

  • Do not begin plumbing work until you have a permit.
  • piping isometric drawing for bathroom

    Allow seven business days for review of application and issue of permit.install permanent irrigation system install yard hydrant.add or replace dishwasher or garbage disposal.Apply for a plumbing permit if you plan to:









    Piping isometric drawing for bathroom